Your cart is currently empty
Embroidered crest. Dimensions: 10.5 cm (4.1")
STS-97 featured the installation of the first of four pairs of huge solar power arrays on the International Space Station. The 12-day mission was the Canadian Space Agency (CSA) Astronaut Marc Garneau's third—a record for Canadian astronauts at that time.
Garneau used the Canadarm to install the solar arrays that now generate electricity to run all of the Station's systems, including life support, daily operations and scientific equipment. Two American astronauts completed the installation during two space walks. Working inside the Shuttle, Garneau coordinated their activities. Successful installation of the P6 truss and the first set of solar panels was a critical step in construction of the Space Station.
Launch Date: November 30, 2000
Time: 10:06:00 p.m. EST
Site: Kennedy Space Center
Dimensions: 10.5 cm (4.1")